Tel: +44 20 8899 1769

Fit-Out

Examples of our Fit-Out projects

Dunnes Stores, Roscrea, Co. Tipperary
The project involved the construction of a new 2-storey retail store with total floor area of 8,100m2. The works also included extensive conservation works to the adjacent “Malt” building, a listed structure. Internally, the works included the full fit-out of grocery, textile and administration...
» read more

Tennis Village Student Accommodation, Co. Cork – associated fit-out
The village is an integrated student, sporting and commercial development. The main section of the works was the construction of 182 student apartments. The majority of these apartments were 4 bedroom units with a smaller number of 6 bedroom units. Initial site works involved large quantities of roc...
» read more

Thomond Village, University of Limerick – associated fit-out
Thomond Village consists of three residential blocks comprising 106 apartments with a total of 503 bed spaces. A management facility building, which includes accommodation for the Village Manager, is also provided. The scheme is the first development on the University North Campus located across th...
» read more

Cappavilla Village – Student Accommodation, University of Limerick – associated fit-out
Phase 1 Located on the campus of the University of Limerick, the first phase of the Cappavilla development consists of 4 blocks of 3, 4 and 5 storey in height with 64 student apartments, incorporating 41 no. 6-bedroom units, 16 no. 4-bedroom units and 7 no. 2-bedroom units. The development also inc...
» read more

Dromroe Village Student Accommodation, University of Limerick – associated fit-out
Dromroe Village is a student accommodation complex, arranged along each side of an open air plaza, or street. There are 11 blocks in all, varying in height from three to five-storeys. There are 480 bedrooms, all with bathrooms en-suite. These are typically arranged in apartments of 6 bedrooms. The c...
» read more

Rathkeale Library & Area Offices, Co. Limerick – associated fit-out
The works involved the refurbishment of the existing Library Building and the construction of a new extension to provide a new Library and local area County Council Offices in Rathkeale Town. External finishes include slate roofing, rendered walls and sash windows to the existing building and a mix...
» read more

Mid West Health Board, Head Office and Laboratories, Raheen, Limerick – associated fit-out
The works involved the provision of 3,500m² of Office, Storage and Public Health Laboratories within an existing shell. Externally, the works included the demolition and alterations to the existing structure, the replacement of both roof finishes and external cladding/curtain walling. Internally, t...
» read more

Irish Chamber Orchestra Building, University of Limerick – associated fit-out
The Irish Chamber Orchestra Building incorporates a large rehearsal area along with office/administrative facilities. The acoustic requirements for the building were extremely high demanding stringent planning and quality control of all construction details. The double height rehearsal studio was f...
» read more

Induchem Components, Carrigaline, Cork – associated fit-out
The main works involved the construction of new two storey offices and warehouse facilities within an 8 month period from commencement on site to client taking final possession. External features include a curved standing seamed roof, planar glazed entrance and architectural cladding to office and ...
» read more

Glór Music Centre – associated fit-out
Glór is an International Folk Music Centre and is a high-profile tourism/leisure facility in Ennis, Co. Clare. This project consisted of very complex building services and a very high level of internal finish. The floor area of the building was 2,300m2 and the main structure consists of a steel fr...
» read more

Cork Greyhound Stadium – associated fit-out
This Cork Greyhound Stadium project included the complete structure and full internal fitout of the enclosed stand, all function areas and back of house facilities. A striking internal feature of the building is the joinery and fitted furniture. Low-level partitions and ballustrades were constructe...
» read more

Dunnes Stores, Longford – associated fit-out
This project involved the construction and full fit-out of a new retail store with a gross floor area of 7,000 sqm.  The structure comprises of piled foundations with suspended ground floor slab, steel frame with insitu concrete upper floors on metal decking. External walls comprised of glazing an...
» read more

CERT Tourism & Leisure Building, WIT – associated fit-out
This development represents a flagship project for the College. The state of the art facility accommodates 50 staff and 1050 students, providing a diverse array of courses aimed at the Tourism and Leisure Industries. Space is allocated for language laboratories, catering training kitchens, sports s...
» read more

Clarion Hotel, Limerick – associated fit-out
This 17 storey building incorporated a 10 storey 93 bedroom 4 star hotel along with 29 apartments on the upper floors. The interior fit-out of the Clarion Hotel was carried out in conjunction with the overall contract for constructing the shell and core of this landmark building. Having fitted out,...
» read more

Rubicon Centre, Cork Institute of Technology, Cork – associated fit-out
The high quality fit-out of this innovation and research centre consisted of partitioned offices, suspended ceilings and hardwood joinery. Hardwood flooring was fitted to common and break-out areas, and carpet and ceramic tiles to offices and toilet areas respectively. A full fitted furniture packag...
» read more

Áras Moyola, NUIG – associated fit-out
This National University of Ireland Galway (NUIG) project entailed the construction of a new Nursing, Therapies, Sociology and Politics (NTSP) building which included treatment rooms, phonetics and recording booths, rehab facilities, various treatment laboratories, lecture theatre, study areas, clas...
» read more

Dunnes Stores, Carrigaline, Co Cork – associated fit-out
These works involved the construction of a new 4,500m² store within a 6 1/2 month period from commencement on site to the store opening date. Due to the sloping nature of the site, the initial works included a large bulk excavation with 150 lin.m of contiguous piling and 400 lin.m of retaining wall...
» read more

Office Development, Francis Street, Ennis, Co. Clare – Fit-Out
BMCC Construction were commissioned to design and construct the fit-out of a 750m² ground floor office for the Motor Taxation Section of Clare County Council. Working with local Architect Kostas Wootis, we took the project from 'shell and core' to completion within a 4 week construction period. The...
» read more

Bunratty Castle Hotel, Bunratty, Co. Clare – associated fit-out
The project involved the construction of a three storey 67 bedroom extension, over a lower ground floor leisure facility to match the existing hotel complex. The new gross internal floor area was 3,840m2. The work included bedroom fitouts, gym facilities, a new swimming pool, sauna, jacuzzi, hot tu...
» read more

County Council Area Office, Library & Courthouse, Kilmallock, Co. Limerick
RIAI Architecture Award 2010 for Best Public Building A high profile civic project that combined conservation with modern new build. The works consisted of the demolition of a number of existing structures, restoration and conservation of an existing stone building, construction of a new library, ...
» read more

The Offices of The Revenue Commissioners, Fairgreen Rd., Galway – Fit-Out
This project comprised of the fit-out of the basement, ground, mezzanine, first and second floors along with minor demolitions and alterations of the existing shell and core building. The scope of works included raised access flooring, suspended ceilings, bulkheads, various partition systems includ...
» read more

Fermoy Courthouse and New Civic Offices, Co. Cork
This project comprised of the refurbishment of the existing Courthouse and the construction of new Civic Offices. Works included new lime plaster to internal walls, new timber sash windows to original detail, restoration works to existing floors/timber stairs, restoration works to original furniture...
» read more

Ennis Courthouse, Ennis, Co Clare – Refurbishment and Fit-Out
This project entailed a 3,000m2 major refurbishment of an existing 19th Century listed building of national importance carried out in an urban / residential environment. Works consisted of the removal of the existing lime plaster while retaining the period mouldings which were intact, replacing the...
» read more

Ennis General Hospital
This project involved sealed screening of existing live working areas, demolition of walls, partitions and ceilings within existing live hospital, temporary relocation of existing facilities, upgrading and replacement of laboratory structures, finishes and furniture. Daily liaison with hospital man...
» read more

Johnson & Johnson Vision Care, Sunbury-on-Thames
This project consisted of the provision of new meeting rooms, toilet facilities and reception area for this plant which has a workforce of approximately 200 operatives. Following the completion of the toilet facilities, and meeting rooms the existing toilet facilities together with existing recepti...
» read more

Watch House Cross Development & Library Fit Out, Limerick
Watch House Cross is a mixed use development for a private client including supermarket, library, petrol station, retail units, office units and associated entrance roads and car parking with a total floor area of 5,650m². A further contract with Limerick City Council for the library fit-out inclu...
» read more