This project involves the construction of a new extension to the Operating Department which is situated overhead a functioning dialysis unit. In parallel there will be an extension to the dialysis unit and a new ventilation system installed there. The location for the works is almost completely surrounded by the live hospital and the project duration is 22 weeks incorporating 3 phases.
The works require a high level of care and attention because of ‘at risk’ patients and sterile zones within the vicinity of the construction operations.